The making of a piece
Approximately 25 calendar days for standard production
Dimensions, finish and applicable specifications guide production. The materials, construction and finishing methods depend on the design.
-
Confirm the order details
The production estimate begins after your order and final specifications are confirmed.
-
Prepare the materials and components
Preparation follows the materials and components specified for the design.
-
Build for the design
Construction follows the design of the piece. Wood, stone and upholstered furniture require different processes.
-
Finish and assemble
Finishing and assembly follow the materials, construction and selected options of the piece.
-
Protect for the journey
Packing requirements reflect the size, materials and planned delivery method of the piece.